434
Lords in paragraph 8 of their Repart
of 31th of March) in the following terms :
The Committed are
strongly of opinion that wherever it is pozuble it is most desirable that tramward, Especially in towns, should be Constructed and maintained, though not worked by the local authorities. In this the repair bust
manzgement of the whole- the roadway is kept in the same hands and the interests of the general traffic
Thore Certainly
ucured.
way
میرے
to driefly summed up, the following
are the technical provisions, based on
the best and most modern practice of Framway Construction Auch worke
The ch Working
I would venture to recomment for
Tag động
1.
1 . The laying of double tramways as ap= plied for by the promoters, Except along
Queen's Road between the City Hall and Naval yard where only a sugle line shout
be laist.
ii. The tramways to be laid along the centre.
of the streets in the city, and at the Extreme.
side along the Shankuvan road.
iii. The alterations to sewers to be done by the
Government at the cost on
the
Company.
iv. The Company to depray the cost.
- cost of lowering,
raising, or temporarily deviating the tramways
if necessitated by public improvements. ✓ . The gas, water, and telegraph pipes to be removed by their respective of the Compains.
owners at the
vi. eta iron permanent way.
at the cast
vii. The road to be paved if horses are used
for the traction of
viii. The form of
hamcard.
forn of tail to be altered shouts
Experience prove necessary.